Steel Structure Processing on Sale-manufacture,factory,supplier from China

(Total 24 Products for Steel Structure Processing on Sale)
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionWe completely remember the necessities of residential features and clean decoration on this restricted space of the residence, and there is now not the conventional metal structure and some concrete shape of the convex beam phenomenon. after the optimization and innovation node, the connection approach and manufacturing process are smooth to control the satisfactory of technology.Steel construction projectSteel projects in China
  Contact Now
Basic InstructionGuoshun Group signed a contract with Chile Otero company on December 13, 2018, started shipping on March 15, 2019, and shipped the last batch on May 7, 2019. A total of eight batches were shipped by sea, 58 40 foot high cabinets and 383 tons of steel structures. On September 23, 2019, Lu Baoyin, deputy general manager of the group, and Xie liangtao, Minister of international trade, arrived in Chile to attend the completion ceremony of iquik champion stadium.
  Contact Now
Basic InstructionWe have a legitimate system of qualifications, the prevailing steel form engineering contracting qualification (Level I), steel form manufacturing and installation qualification (Level I), moderate steel form engineering format qualification (Grade A), mechanical and electric powered introduction widespread contracting qualification (Level I), environmental engineering contracting qualification (Level I) etc., in trendy with 20 qualifications.Steel construction projectSteel projects in China
  Contact Now
Basic InstructionGuoshun Group signed a contract with Chile Otero company on December 13, 2018, started shipping on March 15, 2019, and shipped the last batch on May 7, 2019. A total of eight batches were shipped by sea, 58 40 foot high cabinets and 383 tons of steel structures. On September 23, 2019, Lu Baoyin, deputy general manager of the group, and Xie liangtao, Minister of international trade, arrived in Chile to attend the completion ceremony of iquik champion stadium.
  Contact Now
Basic InstructionRonald lwakatare, leader government of tanzania's rapid transit authority, said that they had obtained $148.1 million for segment iii and $99.9 million for segment iv. "the finances acquired will contribute to the actual construction of brt infrastructure, and the government might be chargeable for compensating individuals who could be affected by the challenge," he stated.
  Contact Now
Composite wear-resistant plate has the characteristics of high wear resistance, impact resistance and easy processing. It can be connected with other structural parts by welding, plug welding and bolt connection. It is widely used in ports, docks, metallurgy, cement, coal, power, mines, steel, building materials, bricks and other industries.
  Contact Now
Basic InstructionWe fully take into account the requirements of residential functions and easy decoration in this limited space of the house, and there is no longer the traditional steel structure and some concrete structure of the convex beam phenomenon. After the optimization and innovation node, the connection method and production process are easy to control the quality of technology.Steel construction projectSteel projects in China
  Contact Now
IntroducePlate heat exchanger has the characteristics of excessive warmness change performance, small heat loss, compact and light-weight shape, small ground vicinity, wide software and lengthy service lifestyles.
  Contact Now
   A steel truss for houses began to appear in the last 4-5 years. Previously, conventional steel material had been widely used, but for industrial construction.   A conventional steel structure is known for strong and has high durability. This structure allows the building to be made with a wide span. The steel used for construction is generally I-shaped and tied each other using the dynabolt system.    The original steel material is black. The color of steel sold on the market is generally given further treatment.
  Contact Now
Domestic steel structure Bridges, including pedestrian Bridges, river Bridges and so on.
  Contact Now
Basic InstructionShandong GuoShun International trade co., ltd. AND Afghan ARYANA NAWEEN BERADRAN CONSTRUCTION AND ROAD BUILDING COMPANY AFN ACCT signed a contract for the steel structure Bridges on June 22, 2018.
  Contact Now
    On April 20, the closing ceremony of the Tanzanian new WAMI bridge built by Chinese enterprises was held in msata city. Chinese ambassador to Tanzania chenmingjian and Tanzanian Minister of national engineering makamembalawa attended the ceremony.    The new WAMI bridge is 310 meters long and 11.85 meters wide. It is a two-way single lane bridge across both banks of the WAMI river., In sharp contrast to the old WAMI bridge not far away.
  Contact Now
InstructionCentral heating, iron and metal organizations and thermal electricity flowers in urban wintry weather are large-scale coal-fired production, which has grow to be the supply of air pollution. in recent years, all localities have followed active environmental safety policies.
  Contact Now
TypesSome common types of steel buildings are "straight-walled" and "arch," or Nissen or Quonset hut. Further, the structural type may be classed as clear span or multiple span. A clear span building does not have structural supports (e.g. columns) in the interior occupied space.Straight-walled and arch type refer to the outside shape of the building. More generally, these are both structural arch forms if they rely on a rigid frame structure.
  Contact Now
Basic InstructionDart is a public transportation system based on public transportation. It connects the suburb of Dar es Salaam with the central business district. The center began operation in May 2016. The first phase of construction was completed in December 2015, with a total cost of 159.6 million euros, funded by the African Development Bank, the world bank and the Tanzanian government. The first phase of the BRT system, with a total length of 21 km, extends from kimara via ubungo to kivukoni, Morocco and gerezani.
  Contact Now
The picture is the steel structure bridge components produced in our factory.
  Contact Now
Basic InstructionDart is a public transportation gadget primarily based on public transportation. it connects the suburb of dar es salaam with the critical enterprise district. the center started out operation in may 2016. the primary section of production turned into completed in december 2015, with a complete price of 159.6 million euros, funded via the african improvement bank, the arena financial institution and the tanzanian authorities.
  Contact Now
Basic InstructionThe bridge has a total period of 111 meters and a span of 5 meters,forty-four meters of it had been blown up throughout the preventing.
  Contact Now
Basic InstructionThe bridge has a total duration of 111 meters and a span of 5 meters,40-4 meters of it have been blown up for the duration of the combating.
  Contact Now
Basic InstructionThe steel structure fabrication is complying with CE-Exc3 certification and we can provide you the welding steel structure with executive standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectAustralia steel bridgeSteel projects in China
  Contact Now
IntroduceSteel structure platform is a structural platform composed of steel material, which is one of the main types of building structure of the platform.The structure is mainly composed of steel beam, steel column, steel truss and other components made of type steel and steel plate, and adopts silanization, pure manganese phosphorization, washing and drying, galvanizing and other rust removal and rust prevention technology.Welds, bolts or rivets are usually used between the members or components.Because of its light weight and simple construction, it is widely used in platform engineering p
  Contact Now
Steel structure is a natural fabricated structure, but not all steel structures are fabricated buildings, especially not good fabricated buildings. So what kind of steel structure building can be considered as a good prefabricated building?
  Contact Now
Steel structure bridge is a form of bridge, refers to a bridge top knot important load bearing capacity part is made of stainless steel profiles. The steel structure bridge is the same as the bridge, which is above the height of rivers, lakes and sea bottom cut barriers. The middle long-span bridge is more likely to see prestressed steel concrete bridge and steel structure bridge. The structure of a steel structure bridge consists of a main bridge along its longitudinal direction.
  Contact Now
Relate News
Economic systemThe metal shape building makes use of superior design and processing generation and large-scale production methods so that the fee may be considerably reduced. simultaneously, the simple and speedy installation saves many production charges and permits corporations or builders to put it into production extra quick.Conventional bolstered concrete homes have a excessive value of civil production and long production intervals.
For the steel frame shape, with the growth of the wide variety of layers and height and bearing a large vertical load, the lateral resistance (wind load, earthquake movement, and so forth.) requirements turn out to be the primary bearing traits of the body.The steel frame shape device is typically divided into frame structure, frame bracing structure, body shear wall structure, and body tube structure.Frame shape: the frame contains columns and beams bearing vertical and lateral forces.
Recently, more than 400 tons of steel structure products produced and processed by Guoshun Group's smart factory passed the inspection and were loaded and shipped to New Zealand. On October, Guoshun Group's export volume has exceeded 100 containers. It is reported that the steel structure products shipped this time will be used in the construction of the "Ferry Terminal in Wellington and Picton, New Zealand".
Recently, the 2022 business conference of the group with the theme of "upholding the integrity and expanding the new, striving for the future" was held in the publicity and education center on the 8th floor of the headquarters. The whole group gathered together to discuss new ideas for the development of the company's long-term operation, innovative operation and future operation under the new industry ecology.
On August 18, 2022, the high-quality development summit forum of the steel structure industry in the Yellow River Basin was successfully held in Jinan under the guidance of the housing and Urban Rural Development Department of Shandong Province, sponsored by the steel structure industry association of Shandong Province, and organized by Shandong Guoshun Construction Group Co., Ltd. and Guoshun Lvjian Technology Co., Ltd.
On July 5, Carl Peters, General Manager of Cedex Steel and Metals Ltd. in New Zealand, and Luan Xin, head of Qingdao Branch in China, visited Guoshun Group for inspection and exchange.
The Dubai Expo 2020 has come to a glorious end. As the "finale" of the series of provincial activities of The China Pavilion, the opening ceremony of Shandong Week attracted political and business representatives from many countries, regions and international organizations from all over the world to participate in the event online and offline.
      The reconstruction project of national fitness center in Changqing district undertaken by Guoshun Group was selected as gold medal project of Steel structure in Shandong Province by Shandong Steel Structure Industry Association.       The National Fitness Center project in Changqing District is a key project in Changqing District. With a total investment of 140 million yuan, the project covers an area of 38197.1 square meters and a total construction area of 26188.85 square meters, including 21772.21 square meters of newly built construction area.
Recently, the 2022 cost management conference of the group company with the theme of "forcing cost reduction to achieve lean, high-quality and high-speed sustainable development" was held in the publicity and education center on the 8th floor of the headquarters.