Prefabricated Villa in the Suburbs-manufacture,factory,supplier from China

(Total 24 Products for Prefabricated Villa in the Suburbs)
Basic InstructionIt's far stated that because september 2021, the low-carbon generation manipulate crew of beijing university of technology has taken the lead and cooperated with eight devices, which incorporates the countrywide speed skating hall, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon funding generation co., ltd., beijing green trade co., ltd.
  Contact Now
Basic InstructionIt's miles mentioned that because september 2021, the low-carbon generation control team of beijing college of technology has taken the lead and cooperated with 8 devices, which includes the countrywide velocity skating corridor, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of cloth sciences of the chinese language academy of sciences, shandong guoshun lvjian technology co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Contact Now
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
  Contact Now
    On April 20, the closing ceremony of the Tanzanian new WAMI bridge built by Chinese enterprises was held in msata city. Chinese ambassador to Tanzania chenmingjian and Tanzanian Minister of national engineering makamembalawa attended the ceremony.    The new WAMI bridge is 310 meters long and 11.85 meters wide. It is a two-way single lane bridge across both banks of the WAMI river., In sharp contrast to the old WAMI bridge not far away.
  Contact Now
Prefabricated Steel Bridges:Prefabricated steel bridges offer numerous advantages in the field of bridge construction.Firstly, prefabricated steel bridges provide a high level of quality control. Since the components are manufactured in controlled conditions, such as factories or precast yards, the quality of materials, manufacturing processes, and construction quality can be better controlled.
  Contact Now
Basic InstructionGuoshun Group signed a contract with Chile Otero company on December 13, 2018, started shipping on March 15, 2019, and shipped the last batch on May 7, 2019. A total of eight batches were shipped by sea, 58 40 foot high cabinets and 383 tons of steel structures. On September 23, 2019, Lu Baoyin, deputy general manager of the group, and Xie liangtao, Minister of international trade, arrived in Chile to attend the completion ceremony of iquik champion stadium.
  Contact Now
Another advantage of prefabricated steel structures is their versatility in design. Steel allows for flexible architectural designs, enabling the creation of unique and visually appealing stadiums. The use of steel also ensures column-free spaces, providing unobstructed views for spectators and maximizing seating capacity.Additionally, the use of prefabricated steel structures reduces construction waste and promotes sustainability. The steel components are fabricated with precision, minimizing material wastage.
  Contact Now
Basic InstructionOur green assembled steel structure technology system uses improved node connection technology. We fully take into account the requirements of residential functions and easy decoration in this limited space of the house, and there is no longer the traditional steel structure and some concrete structure of the convex beam phenomenon.
  Contact Now
Steel structure is a natural fabricated structure, but not all steel structures are fabricated buildings, especially not good fabricated buildings. So what kind of steel structure building can be considered as a good prefabricated building?
  Contact Now
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
  Contact Now
Basic InstructionOur inexperienced assembled metallic shape era device makes use of progressed node connection era. We completely don't forget the necessities of residential capabilities and smooth ornament on this confined area of the house, and there's now not the conventional metallic shape and a few concrete shape of the convex beam phenomenon.
  Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionRecently, the provincial Xiaoqing River comprehensive management leading group came to our city to supervise and inspect the comprehensive management of ecological environment in Xiaoqing River Basin. Vice Mayor Wang Xinwen attended the event.Site DisplayConstruction Process
  Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionThe project team of Beijing Institute of technology independently designed and developed the "measure calculate control seek" technology system of carbon emission, successfully developed the Winter Olympic carbon measurement platform, integrated the human machine material environment data monitoring, carbon emission accounting, evaluation and control functions related to the Winter Olympic carbon emission, carried out the "carbon inventory", scientifically quantified the emission reduction contribution of various technologies, and realized the evaluation of
  Contact Now
InstructionCentral heating, iron and steel enterprises and thermal power plants in urban winter are large-scale coal-fired production, which has become the source of air pollution. In recent years, all localities have adopted active environmental protection policies.
  Contact Now
Basic InstructionThe metal components are painted with primer coating immediately after the shot blasting treatment and the c program languageperiod between that is much less than 30 seconds making sure the robust adhesion film. the thickness of primer may be adjusted with specific additives to meet the anti corrosion requirement. the high quantity of floor treatment and sturdy primer adhesion collectively with normative fireproof coating guarantee the high efficient and lengthy-time period anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionYu Biying, member of the project team of Beijing University of technology and deputy director of the energy and environmental policy research center of Beijing University of technology, introduced to the media, "We have installed intelligent monitoring equipment at dozens of points such as the grandstand area of the venue, energy consuming equipment and audience entrance to collect human-machine and physical environment data such as carbon dioxide concentration, flow of people, electricity, temperature and humidity of the venue in real time.
  Contact Now
Basic InstructionGuoshun Group signed a contract with Chile Otero company on December 13, 2018, started shipping on March 15, 2019, and shipped the last batch on May 7, 2019. A total of eight batches were shipped by sea, 58 40 foot high cabinets and 383 tons of steel structures. On September 23, 2019, Lu Baoyin, deputy general manager of the group, and Xie liangtao, Minister of international trade, arrived in Chile to attend the completion ceremony of iquik champion stadium.
  Contact Now
Basic InstructionYu biying, member of the mission team of beijing college of technology and deputy director of the energy and environmental policy studies center of beijing college of technology, added to the media, "we've got established intelligent monitoring device at dozens of points consisting of the grandstand region of the venue, power eating system and target audience front to acquire human-gadget and physical environment data consisting of carbon dioxide attention, waft of human beings, electricity, temperature and humidity of the venue in actual time.
  Contact Now
Basic InstructionThe whole process supervision and inspection of the project was completed by the international well-known bureau veritas. The design, production and full assembly services of Guoshun group were evaluated as "very satisfied" by the owner icafal Ingenier í a Y constructi ó n S.A. (the sixth largest general contractor in Chile and rated as the national champion of Chilean construction sustainable development company by the Chilean house of Representatives).Site Display
  Contact Now
Basic InstructionDart is a public transportation system based totally on public transportation. it connects the suburb of dar es salaam with the important agency district. the middle started out out operation in may 2016. the primary phase of manufacturing became finished in december 2015, with a complete price of 159.6 million euros, funded thru the african improvement financial institution, the arena monetary organization and the tanzanian authorities.
  Contact Now
Basic InstructionWe have a valid gadget of qualifications, the present metallic shape engineering contracting qualification (Level I), metallic shape production and set up qualification (Level I), mild metallic shape engineering layout qualification (Grade A), mechanical and electric creation wellknown contracting qualification (Level I), environmental engineering contracting qualification (Level I) etc., in general with 20 qualifications.Steel construction projectTanzania steel bridgeSteel projects in China
  Contact Now
Relate News
Recently, more than 400 tons of steel structure products produced and processed by Guoshun Group's smart factory passed the inspection and were loaded and shipped to New Zealand. On October, Guoshun Group's export volume has exceeded 100 containers. It is reported that the steel structure products shipped this time will be used in the construction of the "Ferry Terminal in Wellington and Picton, New Zealand".
      The reconstruction project of national fitness center in Changqing district undertaken by Guoshun Group was selected as gold medal project of Steel structure in Shandong Province by Shandong Steel Structure Industry Association.       The National Fitness Center project in Changqing District is a key project in Changqing District. With a total investment of 140 million yuan, the project covers an area of 38197.1 square meters and a total construction area of 26188.85 square meters, including 21772.21 square meters of newly built construction area.
    Jointly sponsored by Shandong Housing and Urban-Rural Development Department and Jinan Municipal People's Government, jointly undertaken by Jinan Housing and Urban-Rural Development Bureau and Jinan New And Old Energy Conversion Zone, the 5th Shandong Green Building and Building Energy Saving New Technology Products Expo was grandly opened in Shandong International Convention and Exhibition Center.     "Promote green development in urban and rural areas and create a better and livable life".
Recently, Guoshun Group won the top 100 private enterprises in Jinan, and the top ten high-end equipment and intelligent manufacturing industries! Zhang Lianbo, member of the party group of Jinan Private Economic Development Bureau, and Meng Haibo, member of the party group of the Municipal Federation of Industry and Commerce, attended the awarding ceremony of Changqing District. Sun Deshan, chairman of Guoshun Group, was invited to attend and speak.Guoshun Group has always insisted on leading the development of the industry driven by technological innovation.
For the steel frame shape, with the growth of the wide variety of layers and height and bearing a large vertical load, the lateral resistance (wind load, earthquake movement, and so forth.) requirements turn out to be the primary bearing traits of the body.The steel frame shape device is typically divided into frame structure, frame bracing structure, body shear wall structure, and body tube structure.Frame shape: the frame contains columns and beams bearing vertical and lateral forces.
On July 5, Carl Peters, General Manager of Cedex Steel and Metals Ltd. in New Zealand, and Luan Xin, head of Qingdao Branch in China, visited Guoshun Group for inspection and exchange.
On August 18, 2022, the high-quality development summit forum of the steel structure industry in the Yellow River Basin was successfully held in Jinan under the guidance of the housing and Urban Rural Development Department of Shandong Province, sponsored by the steel structure industry association of Shandong Province, and organized by Shandong Guoshun Construction Group Co., Ltd. and Guoshun Lvjian Technology Co., Ltd.
In order to thoroughly implement the strategy of strengthening the city through industry, promote the in-depth development of intelligent technological transformation, and accelerate the pace of high-end, intelligent and green technological transformation of enterprises, Jinan Municipal Bureau of industry and Information Technology launched a solicitation activity for "Jinan industrial technological transformation service providers" to the society.
Recently, the Third Forum on the Coordinated Development of the Belt and Road Initiative and the Building of a Manufacturing Powerhouse and the 2022 China Industrial Carbon Summit Forum were held in Hainan Province. At the meeting, the list of "the first Chinese industrial carbon peak 'leader' enterprises" was released, and a total of 42 outstanding enterprises were selected.
A few days ago, the steel beam hoisting construction of Bandri railway overpass bridge was completed for the bid section 1 project of phase II BRT project in Tashi, Tanzania.The upper part of the overpass is composed of steel structure I-beams and reinforced concrete bridge deck, which are spliced by 126 I-steel beams, with a total length of 80m.