Prefabricated Plant-manufacture,factory,supplier from China

(Total 24 Products for Prefabricated Plant)
Basic InstructionOur inexperienced assembled metallic shape era device makes use of progressed node connection era. We completely don't forget the necessities of residential capabilities and smooth ornament on this confined area of the house, and there's now not the conventional metallic shape and a few concrete shape of the convex beam phenomenon.
  Contact Now
Prefabricated Steel Bridges:Prefabricated steel bridges offer numerous advantages in the field of bridge construction.Firstly, prefabricated steel bridges provide a high level of quality control. Since the components are manufactured in controlled conditions, such as factories or precast yards, the quality of materials, manufacturing processes, and construction quality can be better controlled.
  Contact Now
InstructionPrimary heating, iron and metallic groups and thermal strength plant life in city wintry weather are large-scale coal-fired manufacturing, which has come to be the supply of air pollutants. in latest years, all localities have followed lively environmental protection guidelines.
  Contact Now
Another advantage of prefabricated steel structures is their versatility in design. Steel allows for flexible architectural designs, enabling the creation of unique and visually appealing stadiums. The use of steel also ensures column-free spaces, providing unobstructed views for spectators and maximizing seating capacity.Additionally, the use of prefabricated steel structures reduces construction waste and promotes sustainability. The steel components are fabricated with precision, minimizing material wastage.
  Contact Now
Steel structure is a natural fabricated structure, but not all steel structures are fabricated buildings, especially not good fabricated buildings. So what kind of steel structure building can be considered as a good prefabricated building?
  Contact Now
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
  Contact Now
Basic InstructionIt's miles mentioned that because september 2021, the low-carbon generation control team of beijing college of technology has taken the lead and cooperated with 8 devices, which includes the countrywide velocity skating corridor, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of cloth sciences of the chinese language academy of sciences, shandong guoshun lvjian technology co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Contact Now
Basic InstructionThe project team of Beijing Institute of technology independently designed and developed the "measure calculate control seek" technology system of carbon emission, successfully developed the Winter Olympic carbon measurement platform, integrated the human machine material environment data monitoring, carbon emission accounting, evaluation and control functions related to the Winter Olympic carbon emission, carried out the "carbon inventory", scientifically quantified the emission reduction contribution of various technologies, and realized the evaluation of
  Contact Now
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
  Contact Now
Basic InstructionThe metal components are painted with primer coating immediately after the shot blasting treatment and the c program languageperiod between that is much less than 30 seconds making sure the robust adhesion film. the thickness of primer may be adjusted with specific additives to meet the anti corrosion requirement. the high quantity of floor treatment and sturdy primer adhesion collectively with normative fireproof coating guarantee the high efficient and lengthy-time period anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionIt's far stated that because september 2021, the low-carbon generation manipulate crew of beijing university of technology has taken the lead and cooperated with eight devices, which incorporates the countrywide speed skating hall, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon funding generation co., ltd., beijing green trade co., ltd.
  Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionOur green assembled steel structure technology system uses improved node connection technology. We fully take into account the requirements of residential functions and easy decoration in this limited space of the house, and there is no longer the traditional steel structure and some concrete structure of the convex beam phenomenon.
  Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
IntroducePlate warmness exchanger has the characteristics of excessive warmness trade overall performance, small heat loss, compact and mild-weight shape, small ground place, extensive software program and lengthy carrier life.
  Contact Now
IntroducePlate heat exchanger has the characteristics of excessive warmness change performance, small heat loss, compact and light-weight shape, small ground vicinity, wide software and lengthy service lifestyles.
  Contact Now
IntroducePlate heat exchanger has the characteristics of excessive warm temperature alternate ordinary performance, small warmth loss, compact and light-weight shape, small ground region, massive software and extended provider life.
  Contact Now
Stainless steel heat exchanger is a kind of heat exchanger made of stainless steel. It has very good oxidation resistance, safety and health, and is widely used in food, medicine, heating, domestic water, air conditioning return water and other fields. According to the data of the heat exchange equipment promotion center, the stainless steel heat exchanger has better heat transfer effect and longer service life than the traditional carbon steel heat exchanger.Stainless steel heat exchanger has been widely used in many fields at present.
  Contact Now
Wear resistant steel plate refers to special plate products specially used under large area wear conditions. The commonly used wear-resistant steel plate is a plate product which is made by overlaying a certain thickness of alloy wear-resistant layer with high hardness and excellent wear resistance on the surface of ordinary low carbon steel or low alloy steel with good toughness and plasticity. In addition, there are cast wear-resistant steel plates and alloy quenched wear-resistant steel plates.
  Contact Now
Falling film evaporation is to add the feed liquid from the upper tube box of the heating chamber of the falling film evaporator, evenly distribute it to each heat exchange tube through the liquid distribution and film-forming device, and form a uniform film to flow from top to bottom under the action of gravity, vacuum induction and air flow. During the flow process, it is heated and vaporized by the shell side heating medium. The generated steam and liquid phase enter the separation chamber of the evaporator together.
  Contact Now
Basic InstructionRonald lwakatare, chief executive of Tanzania's rapid transit authority, said they had received $148.1 million for phase III and $99.9 million for phase IV. "The funds obtained will contribute to the actual construction of BRT infrastructure, and the government will be responsible for compensating people who will be affected by the project," he said.
  Contact Now
Basic InstructionRonald lwakatare, chief govt of tanzania's speedy transit authority, stated they'd received $148.1 million for section iii and $99.9 million for section iv. "the funds obtained will make contributions to the actual production of brt infrastructure, and the government might be answerable for compensating people who will be tormented by the project," he stated.Under Construction
  Contact Now
Basic InstructionThis project reflects that our company has a mature industrial chain in undertaking international projects, including design, production and installation, and conforms to local standards. It also indicates that our business is steadily moving forward to the world!Under Construction
  Contact Now
Relate News
    Recently, the "industrial flue gas multi pollutant ultra low emission Engineering Research Center" led by Guoshun group was recognized as the engineering research center of Shandong Province.
Recently, Guoshun Group won the top 100 private enterprises in Jinan, and the top ten high-end equipment and intelligent manufacturing industries! Zhang Lianbo, member of the party group of Jinan Private Economic Development Bureau, and Meng Haibo, member of the party group of the Municipal Federation of Industry and Commerce, attended the awarding ceremony of Changqing District. Sun Deshan, chairman of Guoshun Group, was invited to attend and speak.Guoshun Group has always insisted on leading the development of the industry driven by technological innovation.
On June 30, 2022, nearly 40 new employees came to the group headquarters to jointly participate in the 2022 youth plan growth training camp of Guoshun group for a period of 10 days.
In order to accurately focus on the progress of the construction project of "Guoshun green low carbon demonstration Industrial Park", and scientifically handle the relationship between construction safety and production development.
From August 10 to 12, 2021, representatives of African Development Bank, Tanzania Ministry of Finance, BRT Authority of Tanzania Economic capital And Tanzania Highway Authority, owner of the project, visited the BRT-2 Phase 1 project of Tanzania for a three-day evaluation and inspection. The investigation team inspected the construction of the bridge, asphalt concrete pavement and bus station under construction, and listened to the detailed report of the project leader on the progress of the project and the difficulties faced at present.
Jinan Changqing District National Fitness Center Reconstruction Project is located in the west of Changqing District People's Court and north of Qinghe Street, which is a key construction project in Changqing District. Jinan Changqing District Education and Sports Bureau invested about 140 million yuan to build Changqing District National Fitness Center, with a total construction area of 21,772.21 square meters, including 16,092.96 square meters above ground, 5,679.25 square meters underground and 23.5 meters high.
In order to thoroughly implement the strategy of strengthening the city through industry, promote the in-depth development of intelligent technological transformation, and accelerate the pace of high-end, intelligent and green technological transformation of enterprises, Jinan Municipal Bureau of industry and Information Technology launched a solicitation activity for "Jinan industrial technological transformation service providers" to the society.
On the afternoon of July 14, Xiao Bangguo, vice president of the metallurgical industry planning and Research Institute, Liu Tao, assistant to the president, Feng fan and Liao Chong visited Shandong Guoshun Construction Group for discussion and research.
         The urban expressway Shanhai Road construction project undertaken by Shandong Guoshun Group is the first expressway after the release of Yantai's "12335" policy plan, which is of great significance to improving the quality of urban functions and enhancing the ability of the central city to radiate and drive. The project starts from the Tashan Tunnel in the north and ends at Lvsida Road in the south, with a total length of about 5.624km.