Prefabricated Dormitory-manufacture,factory,supplier from China

(Total 24 Products for Prefabricated Dormitory)
Basic InstructionThe project team of Beijing Institute of technology independently designed and developed the "measure calculate control seek" technology system of carbon emission, successfully developed the Winter Olympic carbon measurement platform, integrated the human machine material environment data monitoring, carbon emission accounting, evaluation and control functions related to the Winter Olympic carbon emission, carried out the "carbon inventory", scientifically quantified the emission reduction contribution of various technologies, and realized the evaluation of
  Contact Now
Prefabricated Steel Bridges:Prefabricated steel bridges offer numerous advantages in the field of bridge construction.Firstly, prefabricated steel bridges provide a high level of quality control. Since the components are manufactured in controlled conditions, such as factories or precast yards, the quality of materials, manufacturing processes, and construction quality can be better controlled.
  Contact Now
Steel structure is a natural fabricated structure, but not all steel structures are fabricated buildings, especially not good fabricated buildings. So what kind of steel structure building can be considered as a good prefabricated building?
  Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionOur green assembled steel structure technology system uses improved node connection technology. We fully take into account the requirements of residential functions and easy decoration in this limited space of the house, and there is no longer the traditional steel structure and some concrete structure of the convex beam phenomenon.
  Contact Now
Another advantage of prefabricated steel structures is their versatility in design. Steel allows for flexible architectural designs, enabling the creation of unique and visually appealing stadiums. The use of steel also ensures column-free spaces, providing unobstructed views for spectators and maximizing seating capacity.Additionally, the use of prefabricated steel structures reduces construction waste and promotes sustainability. The steel components are fabricated with precision, minimizing material wastage.
  Contact Now
Basic InstructionThe metal components are painted with primer coating immediately after the shot blasting treatment and the c program languageperiod between that is much less than 30 seconds making sure the robust adhesion film. the thickness of primer may be adjusted with specific additives to meet the anti corrosion requirement. the high quantity of floor treatment and sturdy primer adhesion collectively with normative fireproof coating guarantee the high efficient and lengthy-time period anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionIt's miles mentioned that because september 2021, the low-carbon generation control team of beijing college of technology has taken the lead and cooperated with 8 devices, which includes the countrywide velocity skating corridor, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of cloth sciences of the chinese language academy of sciences, shandong guoshun lvjian technology co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Contact Now
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
  Contact Now
Basic InstructionIt's far stated that because september 2021, the low-carbon generation manipulate crew of beijing university of technology has taken the lead and cooperated with eight devices, which incorporates the countrywide speed skating hall, tsinghua university, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon funding generation co., ltd., beijing green trade co., ltd.
  Contact Now
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
  Contact Now
Basic InstructionOur inexperienced assembled metallic shape era device makes use of progressed node connection era. We completely don't forget the necessities of residential capabilities and smooth ornament on this confined area of the house, and there's now not the conventional metallic shape and a few concrete shape of the convex beam phenomenon.
  Contact Now
Basic InstructionThe steel components are painted with primer coating immediately after the shot blasting treatment and the interval between which is less than 30 seconds guaranteeing the strong adhesion film. The thickness of primer can be adjusted with different components to satisfy the anti corrosion requirement. The high quantity of surface treatment and strong primer adhesion together with normative fireproof coating guarantee the high efficient and long-term anti corrosion.Steel structure pre-treatmentSteel structure fabricationPacking and shipping
  Contact Now
Basic InstructionDart is a public transportation system based on public transportation. It connects the suburb of Dar es Salaam with the central business district. The center began operation in May 2016. The first phase of construction was completed in December 2015, with a total cost of 159.6 million euros, funded by the African Development Bank, the world bank and the Tanzanian government. The first phase of the BRT system, with a total length of 21 km, extends from kimara via ubungo to kivukoni, Morocco and gerezani.          Construction Process
  Contact Now
IntroducePlate warmness exchanger has the characteristics of excessive warmth change overall performance, small warmth loss, compact and light-weight form, small floor vicinity, huge software and prolonged service lifestyles.
  Contact Now
Basic InstructionThe complete procedure supervision and inspection of the assignment was finished by the worldwide famous bureau veritas. the layout, manufacturing and full meeting offerings of guoshun institution have been evaluated as "very satisfied" via the owner icafal ingenier í a y constructi ó n s.a. (the sixth biggest wellknown contractor in chile and rated as the countrywide champion of chilean construction sustainable development employer by using the chilean house of representatives).Site Display
  Contact Now
Basic InstructionIt is reported that since September 2021, the low-carbon technology management team of Beijing University of technology has taken the lead and cooperated with 8 units, including the national speed skating hall, Tsinghua University, Beijing University of Aeronautics and Astronautics, Hefei Institute of material sciences of the Chinese Academy of Sciences, Shandong Guoshun Lvjian Technology Co., Ltd., Beijing Zhongchuang carbon investment Technology Co., Ltd., Beijing Green Exchange Co., Ltd.
  Contact Now
Basic InstructionThis project reflects that our company has a mature industrial chain in undertaking international projects, including design, production and installation, and conforms to local standards. It also indicates that our business is steadily moving forward to the world!
  Contact Now
Product application in airport case show
  Contact Now
Basic InstructionIt is mentioned that due to the fact that september 2021, the low-carbon era control crew of beijing college of technology has taken the lead and cooperated with eight devices, along with the national pace skating corridor, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of fabric sciences of the chinese language academy of sciences, shandong guoshun lvjian era co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing green exchange co., ltd.
  Contact Now
Basic InstructionIt is mentioned that due to the fact september 2021, the low-carbon era control team of beijing college of generation has taken the lead and cooperated with eight units, including the countrywide velocity skating hall, tsinghua college, beijing college of aeronautics and astronautics, hefei institute of material sciences of the chinese language academy of sciences, shandong guoshun lvjian generation co., ltd., beijing zhongchuang carbon investment era co., ltd., beijing inexperienced trade co., ltd.
  Contact Now
Basic InstructionThe project team of Beijing Institute of technology independently designed and developed the "measure calculate control seek" technology system of carbon emission, successfully developed the Winter Olympic carbon measurement platform, integrated the human machine material environment data monitoring, carbon emission accounting, evaluation and control functions related to the Winter Olympic carbon emission, carried out the "carbon inventory", scientifically quantified the emission reduction contribution of various technologies, and realized the evaluation of
  Contact Now
H-section steel is a kind of economic section high-efficiency profile with more optimized section area distribution and more reasonable strength weight ratio. It is named after its section is the same as the English letter "H". Since all parts of H-shaped steel are arranged at right angles, H-shaped steel has been widely used for its advantages of strong bending resistance, simple construction, cost saving and light structure weight in all directions.
  Contact Now
Relate News
Browns Plains Bus StationPROJECT SCOPEThis project located in Australia Browns Plains and adjoining the Grand Plaza shopping aimed to:Provide more passenger waiting space.Provide new fully sheltered platforms with comfortable seating, security cameras and lighting.Improve pedestrian and cyclist connectivity between the bus station, the shopping centre and Browns Plains Road.Improve accessibility for all customers and ensure compliance with disability access standards.Introduce a designated kiss 'n' ride area to drop-off and pick-up passengers.Introduce bicycle storage facilities.A part
The Group's International Trade Department has been deeply involved in overseas markets for many years, and has a complete manufacturing technology system and high-quality overseas resources. Under the severe situation of the globalization of the epidemic, the International Trade Department continues to move forward and continue to develop! This year, it has completed many international projects such as the second phase of Tanzania BRT station, the third phase of Tanzania BRT station, French GEA sodium bromide, and Chilean seawater desalination.
In 2021, the results of the selection of "2020 World's Best Stadium" initiated by the world-renowned professional stadium data website StadiumDB will be announced. The outstanding performance in terms of value, functionality and innovation was selected by the jury of the expert group of architects and was selected as the 20th place in the "Best Stadium of 2020".
         The urban expressway Shanhai Road construction project undertaken by Shandong Guoshun Group is the first expressway after the release of Yantai's "12335" policy plan, which is of great significance to improving the quality of urban functions and enhancing the ability of the central city to radiate and drive. The project starts from the Tashan Tunnel in the north and ends at Lvsida Road in the south, with a total length of about 5.624km.
On the afternoon of May 13, 2022, dailongcheng, member of the Standing Committee of the CPC Municipal Committee, director of the publicity department, Secretary of the Education Working Committee of the CPC Municipal Committee, and other leaders visited Guoshun group to carry out research.
Jinan Changqing District National Fitness Center Reconstruction Project is located in the west of Changqing District People's Court and north of Qinghe Street, which is a key construction project in Changqing District. Jinan Changqing District Education and Sports Bureau invested about 140 million yuan to build Changqing District National Fitness Center, with a total construction area of 21,772.21 square meters, including 16,092.96 square meters above ground, 5,679.25 square meters underground and 23.5 meters high.
In order to thoroughly implement the strategy of strengthening the city through industry, promote the in-depth development of intelligent technological transformation, and accelerate the pace of high-end, intelligent and green technological transformation of enterprises, Jinan Municipal Bureau of industry and Information Technology launched a solicitation activity for "Jinan industrial technological transformation service providers" to the society.
  Recently, two rod-arch Bridges in the first phase of the municipal project in Cuizhai South Area of Jinan starting Area have completed the main construction after overall careful planning and careful deployment, laying a foundation for the full opening of municipal roads in this area.   According to the introduction, the first phase of the municipal project in the south area of Cuizhai contains 9 roads, with a total length of 12.457 kilometers, including Cuiqing Road, Cuiqing Branch Road, Trunk Road 1, Jieying Road, North Boundary Road, Hengshi Road, City Exhibition Hall Ring
In November 2024, Guoshun Group was awarded the prestigious ACRS 3679.2 certification for steel products, becoming a leading company in the field of welded H-shaped steel and the first Chinese company to achieve this certification.