China Bridge-manufacture,factory,supplier from China

(Total 24 Products for China Bridge)
Basic InstructionThe bridge has a total duration of 111 meters and a span of 5 meters,40-4 meters of it have been blown up for the duration of the combating.
  Contact Now
Basic InstructionThe bridge has a total period of 111 meters and a span of 5 meters,forty-four meters of it had been blown up throughout the preventing.
  Contact Now
    On April 20, the closing ceremony of the Tanzanian new WAMI bridge built by Chinese enterprises was held in msata city. Chinese ambassador to Tanzania chenmingjian and Tanzanian Minister of national engineering makamembalawa attended the ceremony.    The new WAMI bridge is 310 meters long and 11.85 meters wide. It is a two-way single lane bridge across both banks of the WAMI river., In sharp contrast to the old WAMI bridge not far away.
  Contact Now
Basic InstructionThe bridge has a total length of 111 meters and a span of 5 meters,Forty-four meters of it were blown up during the fighting.
  Contact Now
Basic InstructionRonald lwakatare, leader executive of tanzania's fast transit authority, said that they had acquired $148.1 million for phase iii and $99.9 million for phase iv. "the price range acquired will make contributions to the real construction of brt infrastructure, and the authorities might be accountable for compensating folks that will be tormented by the assignment," he said.the bridge has a total period of 111 meters and a span of five meters,40-4 meters of it were blown up for the duration of the preventing.
  Contact Now
The picture is the steel structure bridge components produced in our factory.
  Contact Now
Steel structure bridge is a form of bridge, refers to a bridge top knot important load bearing capacity part is made of stainless steel profiles. The steel structure bridge is the same as the bridge, which is above the height of rivers, lakes and sea bottom cut barriers. The middle long-span bridge is more likely to see prestressed steel concrete bridge and steel structure bridge. The structure of a steel structure bridge consists of a main bridge along its longitudinal direction.
  Contact Now
    Steel frame bridge is a bridge whose main bearing structure is steel, i.e. steel structure bridge and steel bridge. Fabricated steel bridges have been widely used all over the world. The original fabricated steel bridge was designed by the British engineer Donald Bailey at the beginning of the Second World War in 1938. The main design concept is to assemble the assembled steel bridge with the least types of unit members, which can bear various loads and different spans, and only need to be transported by ordinary medium-sized trucks.
  Contact Now
IntroductionSteel bridge is a bridge whose main bearing structure is steel, i.e. steel structure bridge and steel bridge. Fabricated steel bridges have been widely used all over the world. The original fabricated steel bridge was designed by British engineer Donald Bailey at the beginning of World War II in 1938. The main design concept is to assemble the fabricated steel bridge with the least kinds of unit components, which can bear various loads and different spans, and only need to be transported by general medium-sized trucks. In special cases, it can be built entirely by manpower
  Contact Now
Basic InstructionThe metal shape fabrication is complying with CE-Exc3 certification and we will offer you the welding metal shape with govt standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectTanzania steel bridgeSteel projects in China
  Contact Now
Basic InstructionRecently, the provincial Xiaoqing River comprehensive management leading group came to our city to supervise and inspect the comprehensive management of ecological environment in Xiaoqing River Basin. Vice Mayor Wang Xinwen attended the event.Site DisplayConstruction Process
  Contact Now
Basic InstructionThe bridge has a total duration of 111 meters and a span of five meters,forty-4 meters of it had been blown up all through the preventing.
  Contact Now
Basic InstructionThe bridge has a total period of 111 meters and a span of 5 meters,40-4 meters of it were blown up at some point of the preventing.
  Contact Now
Basic InstructionThe metal shape fabrication is complying with CE-Exc3 certification and we will offer you the welding metal shape with govt standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectTanzania steel bridgeSteel projects in China
  Contact Now
Basic InstructionThis project reflects that our company has a mature industrial chain in undertaking international projects, including design, production and installation, and conforms to local standards. It also indicates that our business is steadily moving forward to the world!Under Construction
  Contact Now
Basic InstructionRonald lwakatare, leader executive of tanzania's fast transit authority, said that they had acquired $148.1 million for phase iii and $99.9 million for phase iv. "the price range acquired will make contributions to the real construction of brt infrastructure, and the authorities might be accountable for compensating folks that will be tormented by the assignment," he said.the bridge has a total period of 111 meters and a span of five meters,40-4 meters of it were blown up for the duration of the preventing.
  Contact Now
Basic InstructionWe have a valid gadget of qualifications, the present metallic shape engineering contracting qualification (Level I), metallic shape production and set up qualification (Level I), mild metallic shape engineering layout qualification (Grade A), mechanical and electric creation wellknown contracting qualification (Level I), environmental engineering contracting qualification (Level I) etc., in general with 20 qualifications.Steel construction projectTanzania steel bridgeSteel projects in China
  Contact Now
Basic InstructionThe steel structure fabrication is complying with CE-Exc3 certification and we can provide you the welding steel structure with executive standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectAustralia steel bridgeSteel projects in China
  Contact Now
Basic InstructionWe have a legitimate system of qualifications, the prevailing steel form engineering contracting qualification (Level I), steel form manufacturing and installation qualification (Level I), moderate steel form engineering format qualification (Grade A), mechanical and electric powered introduction widespread contracting qualification (Level I), environmental engineering contracting qualification (Level I) etc., in trendy with 20 qualifications.Steel construction projectSteel projects in China
  Contact Now
Basic InstructionThe steel structure fabrication is complying with CE-Exc3 certification and we can provide you the welding steel structure with executive standard: Welds AS/NZ1554.1/AS1554.5;AWS D1.1/D1.3/D1.5/D1.6; EN1090-2.Steel construction projectAustralia steel bridgeSteel projects in China
  Contact Now
Basic InstructionAccording to the relevant person in charge of the South extension project of Shunhe expressway, the South extension of Shunhe expressway will realize multi-level and full coverage of BRT + rail transit + ordinary bus + tourist bus, maximize the high-quality road resources, tilt to slow and public transport, make public transport travel more convenient, give priority to public transport signals, implement green wave traffic, intelligent monitoring of the whole line, and use information technology to improve traffic management level and travel service level.
  Contact Now
Basic InstructionWe fully take into account the requirements of residential functions and easy decoration in this limited space of the house, and there is no longer the traditional steel structure and some concrete structure of the convex beam phenomenon. After the optimization and innovation node, the connection method and production process are easy to control the quality of technology.Steel construction projectSteel projects in China
  Contact Now
Basic InstructionWe completely remember the necessities of residential features and clean decoration on this restricted space of the residence, and there is now not the conventional metal structure and some concrete shape of the convex beam phenomenon. after the optimization and innovation node, the connection approach and manufacturing process are smooth to control the satisfactory of technology.Steel construction projectSteel projects in China
  Contact Now
Relate News
A few days ago, the steel beam hoisting construction of Bandri railway overpass bridge was completed for the bid section 1 project of phase II BRT project in Tashi, Tanzania.The upper part of the overpass is composed of steel structure I-beams and reinforced concrete bridge deck, which are spliced by 126 I-steel beams, with a total length of 80m.
On July 5, Carl Peters, General Manager of Cedex Steel and Metals Ltd. in New Zealand, and Luan Xin, head of Qingdao Branch in China, visited Guoshun Group for inspection and exchange.
The Dubai Expo 2020 has come to a glorious end. As the "finale" of the series of provincial activities of The China Pavilion, the opening ceremony of Shandong Week attracted political and business representatives from many countries, regions and international organizations from all over the world to participate in the event online and offline.
Expanded creation scheduleFabricated off-website online with geometrically controlled system, structural metal has the benefit of being prepared to erect as soon as it reaches the bridge site. reinforcement and formwork set up is not required. structural metal erection isn't limited to a specific temperature range. structural metal is frequently lighter than different materials for the identical span, ensuing in smaller or fewer erection cranes.
Recently, the Third Forum on the Coordinated Development of the Belt and Road Initiative and the Building of a Manufacturing Powerhouse and the 2022 China Industrial Carbon Summit Forum were held in Hainan Province. At the meeting, the list of "the first Chinese industrial carbon peak 'leader' enterprises" was released, and a total of 42 outstanding enterprises were selected.
From August 10 to 12, 2021, representatives of African Development Bank, Tanzania Ministry of Finance, BRT Authority of Tanzania Economic capital And Tanzania Highway Authority, owner of the project, visited the BRT-2 Phase 1 project of Tanzania for a three-day evaluation and inspection. The investigation team inspected the construction of the bridge, asphalt concrete pavement and bus station under construction, and listened to the detailed report of the project leader on the progress of the project and the difficulties faced at present.
       The stadium project is located in the west district of the starting area for the transformation of old and new kinetic energy in Jinan city, Shandong Province, with a total construction area of 9,824 square meters, including 7,124.84 square meters above ground and 2,698.15 square meters underground. The building height is 20.60 meters, the height is 4.5 meters, and the local height is 11 meters.     Guoshun is the general contractor for the construction of this project.
Economic systemThe metal shape building makes use of superior design and processing generation and large-scale production methods so that the fee may be considerably reduced. simultaneously, the simple and speedy installation saves many production charges and permits corporations or builders to put it into production extra quick.Conventional bolstered concrete homes have a excessive value of civil production and long production intervals.
In 2021, the results of the selection of "2020 World's Best Stadium" initiated by the world-renowned professional stadium data website StadiumDB will be announced. The outstanding performance in terms of value, functionality and innovation was selected by the jury of the expert group of architects and was selected as the 20th place in the "Best Stadium of 2020".
  Recently, two rod-arch Bridges in the first phase of the municipal project in Cuizhai South Area of Jinan starting Area have completed the main construction after overall careful planning and careful deployment, laying a foundation for the full opening of municipal roads in this area.   According to the introduction, the first phase of the municipal project in the south area of Cuizhai contains 9 roads, with a total length of 12.457 kilometers, including Cuiqing Road, Cuiqing Branch Road, Trunk Road 1, Jieying Road, North Boundary Road, Hengshi Road, City Exhibition Hall Ring